Finished bathroom remodel by Seven General Contractors in Woodinville, WA

Bathroom Remodel in Woodinville & the Eastside

Design-to-done bathroom remodels by a licensed, insured Eastside crew — a fixed written scope, a real schedule, and a 2-year labor warranty.

  • Thumbtack 4.9 (93 reviews)
  • Yelp 5.0
  • BBB A+ Accredited
  • WA L&I #SEVENGC808NG

A licensed Eastside crew, start to finish

You want a bathroom that's done right, on a schedule you can plan around, by someone you can actually reach. Seven General Contractors is a licensed Washington remodeler based in Woodinville and serving the whole Eastside. We handle the whole job — design, demolition, plumbing, tile, and finish — with one crew and one point of contact, so nothing falls through the cracks between trades.

What's included: design → demo → build

1. Design & scope (week 1–3)

We measure on-site, talk through layout and fixtures, and hand you a written scope with a fixed price — not a vague ballpark. If permits are needed, we pull them through the City of Woodinville (or Snohomish County for unincorporated addresses). You see the materials list before anything is ordered.

2. Demolition & rough-in (days, not weeks)

We protect floors and pathways, demo the old bathroom, and handle plumbing and electrical rough-in. Anything we open up — old leaks, rot, bad wiring — we show you before we cover it back up.

3. Build & finish (week 2–4)

Waterproofing, tile, vanity, fixtures, paint, and a final walkthrough. We don't call it done until you've checked it with us in person.

Ready to price your bathroom?

Free on-site estimate, fixed written scope, no pressure.

Transparent cost ranges

Every bathroom is priced from an on-site estimate, but here's the honest range for the Eastside so you can plan:

Project typeTypical range
Cosmetic refresh (vanity, fixtures, paint, like-for-like)$8,000 – $15,000
Full mid-range remodel (new tile, shower, vanity, flooring)$15,000 – $30,000
High-end or layout change (move plumbing, primary bath, premium finishes)$30,000 – $50,000+

What moves the number: tile and fixture selections, whether plumbing moves, and what we find once walls are open. Your written estimate locks the scope and price before work starts.

See the full breakdown: How much does a bathroom remodel cost in Washington? →

Timeline: what to expect

Most full bathroom remodels run 3–5 weeks on site once materials are in. A rough schedule:

  • Design, selections & permits: 1–3 weeks (before we start on-site)
  • Demolition & rough-in: 1–3 days
  • Build, tile & finish: 2–4 weeks
  • Final walkthrough & punch list: same week as finish

Cosmetic refreshes can wrap in about a week. We give you the real schedule in writing — and tell you the day before if anything shifts.

What homeowners say

We've been hired 109 times on the Eastside and keep our ratings public:

  • Thumbtack — 4.9★ across 93 reviews
  • Yelp — 5.0★ (21 reviews)
  • BBB — A+ accredited
  • HomeAdvisor — 5.0★

“I just finished a complete remodel of my master bath and updates to my laundry room and kitchen. I couldn't be happier with the end result. Luccas and his team were friendly, professional and incredibly hard working. It was easy to explain my ideas and get advice on each project. It was very easy to communicate with the team and clear that the customer's happiness is of first importance. I will use them again.”

— Sheri, Google review

“We have been planning to renovate our master bathroom for years, and when we got to the point to look for a contractor it wasn't an easy task, we luckily found Seven General contractor, they have done an amazing job, always cleaning the space every day, they are trouble free and gave us the peace of mind that we wanted when remodeling a bathroom. I highly recommend them!”

— Kallita F., Google review

“Luccas and his team were fantastic to work with. He was very responsive and helped answer any questions I had along the way. They did a complete remodel of the bathroom and it came out better than we had expected. Would recommend to anyone without a doubt.”

— Andrew T., Google review

Read all reviews on Thumbtack → · on Yelp → · BBB profile →

Licensed, insured, and warrantied

WA L&I license
SEVENGC808NG
UBI
604642201
Insurance
Licensed, bonded & insured
Workmanship warranty
2-year labor (12-month repair / 10-year full replacement)
Materials
Manufacturer warranties pass through to you

Washington law (RCW 18.27) requires a registered contractor's license on this work — ours is SEVENGC808NG, and it's on every estimate and contract.

Where we work (Eastside service area)

Seven remodels bathrooms across Woodinville and the rest of the Eastside: Bellevue, Kirkland, Bothell, Woodinville, Redmond, Sammamish, and Issaquah. Not sure if you're in range? Call or text (877) 738-3642 — we'll tell you straight.

Related pages:

Bathroom Remodel FAQs — Woodinville

Straight answers to the questions Woodinville homeowners ask before hiring

Most Woodinville and Eastside bathroom remodels run $15,000–$30,000, with cosmetic refreshes starting near $8,000 and high-end or layout-changing projects reaching $50,000+. The biggest cost drivers are your tile and fixture choices and whether plumbing has to move. We give you a fixed written price from a free on-site estimate, so you're not guessing.

Usually yes — if you change plumbing, electrical, or walls, Woodinville requires a permit; a like-for-like cosmetic swap often does not. Permits protect resale value and your insurance, and inspections confirm the work is up to code. Seven pulls the required permits and handles inspections as part of the job, so you don't have to.

Most full bathroom remodels take 3–5 weeks on site once materials arrive, plus 1–3 weeks up front for design, selections, and permits. A cosmetic refresh can finish in about a week. We hand you a written schedule before we start and flag any change the day before it happens.

Yes — small bathrooms and powder rooms are some of our most common Eastside jobs, and smart layout, lighting, and a curbless or glass shower can make a compact space feel much larger. Smaller square footage often means a faster timeline and a lower cost, though tight spaces still need the same waterproofing and code work done right.

Yes — tub-to-shower conversions are one of our most-requested remodels, and most can be done in about 1–3 weeks depending on tile and glass. We handle the plumbing change, waterproofing, tile, and glass, and we'll tell you up front if your space or resale plans are better served by keeping one tub in the home.

Let's build the bathroom you actually want.

Talk to a licensed Eastside remodeler today — free estimate, real timeline, 2-year labor warranty.

Seven General Contractor LLC · WA L&I #SEVENGC808NG · UBI 604642201 · Licensed, bonded & insured · (877) 738-3642 · contact@sevengeneralcontractors.com